What happened: Tuesday 3 November, 18:57
By journalist@web-summit.dinis. Covers site v0.2.137 (17:01 UTC) to v0.2.154 (18:54 UTC): 18 releases and 28 source commits since the 16:57 report.
What happened
- Every size is in. T-shirts a mix of 1 M, 1 L and 1 XL per colour, Dinis's call (WS-130 done,
7079899). Jose sent his at 17:12 (c895e69); WS-55 is merged into WS-130. - Dinis confirmed the generic QR. "XL for me, and switch to generic QR", about 17:05, to the conductor's session (
8107e61). Brief 9 says the designer waits for Dinis's yes in its own session, since a message from the conductor is not his word. - 3 of 7 print sets signed. Vicky, then Angelo ("Approved as per design and sentence",
cead771) and Dinis (c750986). Both are on the current files, so they show superseded when the generic-QR set replaces them. - The files are not final yet. designer@web-summit.dinis has not committed since 15:21 (
aaac9cb); the generic QR is not swapped in and the RiskMandate logo, asked for at 15:22 (d7bda01), is not in the files. - Indi is invited to GitHub. Angelo sent it from his own admin account (
575d48b), which answers who sends the invitations (WS-09). - The meetings vault exists. vault@web-summit.vicky made it, its key sealed to pm@web-summit.vicky (WS-23,
81796d9). Vicky and Nimay go through the booked meetings tomorrow (f0c735d). - The 18:00 stand-up carried 22 open items, 17 for Dinis; settled outside it: the order, the sizes, WS-25 to Wednesday, LinkedIn proposed for Indi (
3f4f3bc). 49 issues are due tomorrow (8578bd0).
Who did what
- conductor@web-summit.dinis 3: the generic QR confirmed, Dinis's sign-off, brief 9.
- conductor@web-summit.angelo 3: Angelo's sign-off, L6, Indi's invitation.
- conductor@web-summit.jose 2, dashboard@web-summit.jose 1: Jose's sizes, brief 4.
- vault@web-summit.vicky 2, dashboard@web-summit.vicky 2, pm@web-summit.vicky 1: the meetings vault, WS-23's date.
- project-manager@web-summit.dinis 2, mentor@web-summit.dinis 2, dashboard@web-summit.angelo 2.
- procurement@web-summit.silvio 1, team-collaboration@web-summit.angelo 1, pulse@web-summit.dinis 1, dev@web-summit.dinis 1, dashboard@web-summit.dinis 1, vault@web-summit.jose 1.
What moved
- The board: WS-130 done (WS-55 merged in); WS-131 new (tools that read history refuse a shallow clone).
- Levels: Vicky and Angelo L6; Jose L5; Indi invited; Nimay still waits on GitHub (WS-09).
- The pulse: still only Vicky's morning check-in; her priority question is still open (
757707a). - The sign-off: 3 of 7 (Vicky, Angelo, Dinis).
What is waiting on whom
- designer@web-summit.dinis: the generic QR swapped in and the RiskMandate logo, tonight, for Friday (WS-113).
- Dinis: the generic-QR yes in the designer's session (brief 9); protect main (WS-105); Nimay's invitation (WS-09).
- Nimay, Jose, Silvio, Indi: sign off your print set once the final files are up (WS-113).
- Indi: accept the GitHub invitation.
- The journalist: WS-123 item 4 (a "for you" line per person) waits on Dinis's word.